List of Appendices

Appendix A | Appendix B | Appendix C | Appendix D | Appendix E | Appendix F
Appendix G | Appendix H | Appendix I | Appendix J | Appendix K | Appendix L
Appendix M | Appendix N | Appendix O | Appendix P | Appendix Q


Appendix A - Agency and Tribal Representatives

 


Appendix A - Request for Designatiuon of PRCC Representatives - 92904

 

Back to Top


Appendix B - Priest Rapids Coordinating Committee Agendas, Minutes, and Operating Protocols

 

Appendix-B PRCC- FINAL Minutes-Dec 9-2004

Appendix-B PRCC- FINAL AGENDA-Jan 19-2005

Appendix-B PRCC- FINAL Agenda-Feb 23-2005

Appendix-B PRCC- FINAL Minutes-Feb 23-2005

Appendix-B PRCC- DRAFT-Conference Call Minutes-Mar 18-2005

Appendix-B PRCC- FINAL Agenda-Mar 25-2005

Appendix-B PRCC- DRAFT Minute-March 25-2005

Appendix-B PRCC- DRAFT Conference Call Minutes-Spill-Apr1-2005

Appendix-B PRCC- DRAFT Operating Protocols-Apr 19-2005

Appendix-B PRCC- FINAL Aenda-Apr 27-2005

Appendix-B PRCC- DRAFT Minutes-Apr 27-2005

 

Back to Top


Appendix C - Priest Rapids Coordinating Committee Hatchery Subcommittee Agendas, Minutes,                       and Operating Protocols

 


Appendix-C PRCC Hatchery - FINAL Agenda-Jan28-2005

Appendix-C PRCC Hatchery -FINAL Minutes-Jan28-2005

Appendix-C PRCC Hatchery - FINAL Agenda-Feb25-2005

Appendix-C PRCC Hatchery -DRAFT Minutes-Feb25-2005

Appendix-C PRCC Hatchery - FINAL Agenda-Mar31-2005

Appendix-C PRCC Hatchery -DRAFT Minutes-Mar31-2005

Appendix-C PRCC Hatchery - FINAL Agenda-Apr21-2005

Appendix-C PRCC Hatchery -DRAFT Minutes-Apr21-2005

 

Back to Top


Appendix D - Hatchery Sharing Agreement - Public Utility District No. 1 of Douglas County and                       Public Utility District No. 2 of Grant County

 


Appendix-D Douglas PUD rearing programs letter 430-1217

Appendix-D Hatchery Sharing Agreement

 

Back to Top


Appendix E - White River Spring-Chinook Supplementation Facilities Plan

 


Appendix-E WR-SPR-CHIN-SUPPLEMENTATION FACILITIES PLAN

 

 

Back to Top


Appendix F - White River Property Research

 


Appendix-F WR PROPERTY RESEARCH-FINAL

 

Back to Top


Appendix G - Priest Rapids Coordinating Habitat Subcommittee, Agendas, Minutes, Operating                       Protocols, and Funding Procedures

 


Appendix-G PRCC Habitat- FINAL Agenda- Jan25-2005

Appendix-G PRCC Habitat- FINAL Minutes- Jan27-2005

Appendix-G PRCC Habitat- FINAL Agenda-Mar17-2005

Appendix-G PRCC Habitat- DRAFT Habitat -Minutes-Mar17-2005

Appendix-G Appendix G - PRCC Habitat- DRAFT Habitat -Meeting Protocols-Apr5-2005

Appendix-G PRCC Habitat- DRAFT Habitat Plan-Apr17-2005

Appendix-G PRCC Habitat- DRAFT Habitat-Funding and Policy and Procedures-Mar10-2005

Appendix-G PRCC Habitat- DRAFT Operating Proceddures

Appendix-G PRCC Habitat- DRAFT Policies-Procedures-Habitat Plan

 

Back to Top


Appendix H - Priest Rapids Off-Ladder Trap

 


Appendix-H 9Mar OLAFT Conf Call

Appendix-H OLAFT Construction Schedule

Appendix-H 30%design-Drawing Set

Appendix-H Exesummary-OLT-19Jan05


Appendix-H Minutes-29Dec-OLT

Appendix-H Minutes-3FEB-OLT

Appendix-H OLT Summary Report

Appendix-H OLT-Design Drawings


 

Back to Top


Appendix I - Priest Rapids Coordinating Committee Spill Representatives

 


Appendix-I 2005 Spring Fish Spill memo1

 

Back to Top


Appendix J - Priest Rapids Collection Channel/Fishway Working Group

 


Appendix-J - 6

 

Back to Top


Appendix K - Performance Standards

 


Appendix-K 2002 Survival of Chin - Various Spill Configs - Wan -PR

Appendix-K 2003 Survival for Chin Smolt at Wan-PR during various spill configs

Appendix-K 2004 PIT-Tag Survival Eval powerpoint-11905.ppt

Appendix-K 2001 Survival Eval- Chinook at Wan-Pr

Appendix-K 2004 PIT Survival Study Final Report

 

Back to Top


Appendix L - Advanced Turbine Testing - Wanapum

 


Appendix-L Advanced Turbine TDG Eval

Appendix-L Wan Advanced Turbine Balloon Tag Eval


 

Back to Top


Appendix M - Turbine Evaluation - Priest Rapids Dam

 


Appendix-M Priest Rapids BALLOON TAG EVAL UPDATE MEMO - 3-22-05

Appendix-M Priest Rapids-Balloon Eval Study Plan flashpaper

Appendix-M Priest Rapids-Balloon Eval Study Plan

 

Back to Top


Appendix N - Future Unit Bypass - Wanapum Dam

 


Appendix-N 2004 Yearling Chinook 3-D acousti cTag Eval

Appendix-N A-FU-G##-E

Appendix-N WA-FU-C##-E

Appendix-N WA-FU-E##-E

Appendix-N WA-FU-M##2-E

Appendix-N 2004-Yearling Chinook-3-D Acoustic Tag Eval.ppt

Appendix-N 2004-Sockeye an dSteelhead-3-D Acoustic Eva.ppt

Appendix-N 2004 Steelhead-sockeye-3-deval-Wan 2004

Appendix N-WA-FU-M##1-E

Appendix N-WA-FU-S##1-E

Appendix N-WA-FU-S##2-E

Appendix N-WFUFB_TechSpecs_PRCC011805

 

Back to Top


Appendix O - Northern Pikeminnow Removal Program

 


Appendix O - 2004-NorthernPikeminnow-Final Report

 

Back to Top


Appendix P - Avian Predator Control

 


Appendix P- 042205 USFWS letter

Appendix P- GCPUD letter to USFWS re Predation Control

Appendix P- USDA 041505 letter -avian predation

Appendix P-AVIAN CONTROL UPDATE MEMO - 3-22-05

 

Back to Top


Appendix Q - Video Fish Counting

 


Appendix Q-Video Count UPDATE MEMO - 3-22-05


 

Back to Top


Get Adobe PDF Reader Here