|
2011
Grant PUD_ 2010 BT Report_Final_2011_Jan_31
GCPUD submittal to FERC 2010 BTMEP LA 401(a)(10) 2-1-2011
2010
Grant PUD files Shallow Water Habitat Water Quality Monitoring Plan 030510
PRP Downstream Passage Alternatives Action Plan_LA 401(a)(1)(8)(9)_P-2114 030510
404 Fishery_Operations_Plan 021110 FINAL FERC
2009
2008-09 PRP Progress and Implementation Plan
2009 Draft Steelhead and Sockeye Survival Evaluation Study Plan
PRP Fishery Operations Plan
White Sturgeon Management Plan
2008
2008 Habitat Project Report
2008 Douglas PUD Interlocal Agreement
2008 Avian Report - 2009 Avian Predator Control Study Plan
2008 Northern Pike Minnow Report - 2009 Removal Study Plan
2008 OLAFT Report
2009 Gas Abatement Plan
2008 PIT-Tag Detection Report
2008 Video Fish Counting Report
2008 Fishway Operations Report
2004
12-Year ONA Reintroduction of Sockeye to Shaka Lake Plan
Chinook Behavior and Survival at Wanapum 2004
2003
White Sturgeon Conservation Aquaculture Plan
Back to Top
2007 BiOp Annual Activity Report
Study Plans and Reports
Statements of Agreement
SOA-2008-01 Skaha Program Mitigation Fulfillment
SOA-2008-02_NNI Recal
SOA-2008-03 Quantitative Objectives
SOA 2009-01 Mass Mark Need for Grant PUD Hatchery Programs 03-19-09
SOA 2009-03 Fish Generation Captive Broodstock Rentention Brood Year 2007 03-16-09
SOA 2009-04 Sub-yearling Chinook Survival Study 03-25-09
SOA 2009-06 Grant PUDs UCR Steelhead Mitigation Requirement
SOA 2009-07 HSC Operating Procedures
SOA 2009-08 Hatchery Design and Water Supply at Nason Creek
SOA 2009-09 Dryden Pond Overwintering Acclimation
SOA 2009-10 Mesh Size for White River Acclimation Site Nets
SOA 2010-01 Nason Creek Culling-Rearing SOA_Approved 02-18-10
SOA 2010-02 PRH Fish Marking Approved 04-21-10
SOA 2010-03 PR Hathcery Rebuild Approved 06-23-10
SOA 2010-04 Emergency Contingency Exception from Fish Mode Aproved 06-23-10
SOA 2010-05 Water Rights Approved 09-16-2010
SOA 2010-06 Gloyd Springs Basis of Design Approved 09-16-2010
SOA 2010-07 Sockeye Salmon Program Approved 09-13-2010
SOA 2010-08 Nason Creek Basis of Design Approved 11-18-2010
SOA 2010-09 White River Basis of Design Approved 11-18-10
SOA 2010-10 Eastbank Hatchery Approved 07-08-2010
SOA 2010-11 UCR Steelhead Mitigation Requirement Approved 09-23-2010
SOA 2010-12 Vernita Bar Redd Counts 11-02-10
SOA 2011-01 Modified Sockeye_Steelhead Survival Studies Approved 02-16-11
SOA 2011-02 Summer Chinook Spawning Dist 03-18-11
SOA 2011-03 Hanford Reach Water Temperture Monitoring 04-05-11
SOA 2011-04 PRCC HSC NNI Recalculation Approved 08-24-11
SOA 2011-05 Mid C White Sturgeon Conservation 12-07-11
SOA 2011-06 Survival Study Schedule 12-05-11
SOA 2011-08 2012 WR Spring Chinook Acclimation Plan 11-16-11
SOA 2011-09 Not to Install Gatewell Screens 01-03-11
SOA 2011-10 Gatewell Dipping Modified Schedule 01-13-12
SOA 2012-01 Grant PUD Hatchery Production Objectives Release Years 2014-2023 01-25-12
SOA 2012-03 Basis of Design Carlton Summer Chinook Acclimation Facility 01-25-12
|